Common Barn West Of A1 Southoe

Common Barn West Of A1 Southoe, TCI renewables, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 6.15 MW, grid supply point Eaton Socon.

Customer
TCI renewables
Status
Connected
Capacity
6.15 MW
Maximum import capacity
5.84 MW
Technology
Onshore wind (Onshore wind turbines)
Flexible connection
No
Grid supply point
Eaton Socon
Bulk supply point
Little Barford 33kV
Voltage
33 kV
Date connected
12 Dec 2018
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
St Neots
Postcode
PE19 5YA
Export MPAN
1050001662250

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.