Grid GuardianOpen the evidence in the app

Collins Power

Collins Power, Collins Power, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2.3 MW, grid supply point Richborough/Sellindge 132kV.

Customer
Collins Power
Status
Connected
Capacity
2.3 MW
Maximum import capacity
0.13 MW
Technology
Gas (Engine (combustion / reciprocating))
Flexible connection
Yes (capacity not firm)
Grid supply point
Richborough/Sellindge 132kV
Bulk supply point
Ruckinge Grid 33kV
Point of connection
Romney Warren 11kV
Voltage
11 kV
Date connected
21 Jul 2020
In a connection queue
No
Row last updated by the DNO
14 Mar 2023
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Collins Road, New Romney
Postcode
TN28 8AN
Export MPAN
1900091892067
Import MPAN
1900091892058

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source