Grid GuardianOpen the evidence in the app

Colchester Borough Homes, Batch 3, Phase 1.

Colchester Borough Homes, Batch 3, Phase 1., Global Heat Source, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.02 MW, grid supply point Rayleigh.

Customer
Global Heat Source
Status
Connected
Capacity
1.02 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Rayleigh
Bulk supply point
Abberton Grid 33kV
Point of connection
Shrub End Primary 11kV
Voltage
11 kV
Date connected
23 Mar 2017
In a connection queue
No
Row last updated by the DNO
14 Feb 2024
Licence area
EPN
Address
Colchester
Postcode
CO3 3TT

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source