Coca Cola

Coca Cola, Coca Cola, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.28 MW, grid supply point Hurst 132kV.

Customer
Coca Cola
Status
Connected
Capacity
1.28 MW
Technology
Gas (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Hurst 132kV
Bulk supply point
Bromley Grid 33kV
Point of connection
Chislehurst 11kV
Voltage
0.4 kV
Date connected
18 Apr 2019
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
London Power Networks plc
Address
Cray Road, Ruxley
Postcode
DA14 5DF

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.