Hurst 132kV grid supply point
3 connections of 1 MW and over at Hurst 132kV in UK Power Networks's register of 14 Oct 2026: 0 MW accepted to connect and 4.5 MW connected. Each row's own figure, added across rows; contracted volume, not headroom.
| Site | Customer | Technology | MW | Status | Target energisation |
|---|---|---|---|---|---|
| Sainsburys Distribution Depot | Sainsburys Distribution Depot | Solar | 1.7 | Connected | |
| Thames Barrier- South Side Supply (Non-Postal) | Thames Barrier- South Side Supply (Non-postal) | Fossil - Oil | 1.5 | Connected | |
| Coca Cola | Coca Cola | Gas | 1.28 | Connected |
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.