Clayhill Farm Greenfield Road

Clayhill Farm Greenfield Road, Anesco Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.2 MW, grid supply point Sundon.

Customer
Anesco Limited
Status
Connected
Capacity
1.2 MW
Maximum import capacity
1.2 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Sundon
Bulk supply point
Westoning Grid 33kV
Voltage
33 kV
Date connected
28 Apr 2017
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Bedford
Postcode
MK45 5JD
Export MPAN
1050001324405

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.