Clayhill Farm (Clayhill 2)

Clayhill Farm (Clayhill 2), Anesco Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 34.9 MW, grid supply point Sundon.

Customer
Anesco Limited
Status
Accepted to connect
Capacity
34.9 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Sundon
Voltage
132 kV
Date accepted
17 Sept 2020
Target energisation
31 Oct 2031
In a connection queue
Yes
Row last updated by the DNO
16 Jan 2023
Licence area
EPN
Address
Sampshill Road, Westoning
Postcode
MK45 5AD

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.