Clay Tye Farm

Clay Tye Farm, Sweco UK Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49.5 MW, grid supply point Warley.

Customer
Sweco UK Limited
Status
Connected
Capacity
49.5 MW
Maximum import capacity
49.5 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
No
Grid supply point
Warley
Voltage
132 kV
Date connected
18 Sept 2023
In a connection queue
No
Row last updated by the DNO
14 Feb 2024
Licence area
EPN
Address
Upminster
Postcode
RM14 3PL
Export MPAN
1050002411894

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.