Grid GuardianOpen the evidence in the app

Checkley Wood

Checkley Wood, MJS Grid Services Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2 MW, grid supply point Sundon.

Customer
MJS Grid Services Limited
Status
Connected
Capacity
2 MW
Maximum import capacity
0.1 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Sundon
Bulk supply point
Sundon 33kV
Point of connection
Leighton Buzzard Primary 11kV
Voltage
11 kV
Date connected
1 Dec 2023
In a connection queue
No
Row last updated by the DNO
14 Apr 2025
Licence area
EPN
Address
Highcliffe, Leighton Buzzard
Postcode
LU7 9LG
Export MPAN
1050003377472

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.