Chalgrave Manor

Chalgrave Manor, Aton Energy Development (Sundon) Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 50 MW, grid supply point Sundon.

Customer
Aton Energy Development (Sundon) Limited
Status
Accepted to connect
Capacity
50 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Sundon
Bulk supply point
Sundon 33kV
Voltage
33 kV
Date accepted
6 Apr 2019
Target energisation
31 Mar 2025
In a connection queue
Yes
Row last updated by the DNO
13 Sept 2024
Licence area
EPN
Address
Dunstable
Postcode
LU5 6HT

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.