Grid GuardianOpen the evidence in the app

Caldecote Manor Farm

Caldecote Manor Farm, Inazin, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 22 MW, grid supply point Eaton Socon.

Customer
Inazin
Status
Connected
Capacity
22 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Eaton Socon
Bulk supply point
Little Barford 33kV
Voltage
11 kV
Date connected
18 Feb 2016
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
St Neots
Postcode
PE19 6XQ
Export MPAN
1050000714182

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.