Burnt House Solar Farm

Burnt House Solar Farm, Abbey Properties (Cambs) Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 4.75 MW, grid supply point Walpole.

Customer
Abbey Properties (Cambs) Limited
Status
Connected
Capacity
4.75 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Walpole
Bulk supply point
March Grid 33kV
Voltage
33 kV
Date connected
19 Feb 2013
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Burnt House Sidings, Whittlesey
Postcode
PE7 2HS
Export MPAN
1030083941034

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.