Brunswick Power

Brunswick Power, Brunswick Power, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 4.05 MW, grid supply point Richborough/Sellindge 132kV.

Customer
Brunswick Power
Status
Connected
Capacity
4.05 MW
Maximum import capacity
0.27 MW
Technology
Gas (Engine (combustion / reciprocating))
Flexible connection
Yes (capacity not firm)
Grid supply point
Richborough/Sellindge 132kV
Bulk supply point
Ashford Grid 33kV
Point of connection
Ashford Central 6.6kV
Voltage
11 kV
Date connected
25 May 2022
In a connection queue
No
Row last updated by the DNO
14 Mar 2023
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Bridge Road, Ashford
Postcode
TN23 1BB
Export MPAN
1900092189975
Import MPAN
1900092189966

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.