Broomfield Solar Farm

Broomfield Solar Farm, Low Carbon Solar Park Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 20 MW, grid supply point Bolney.

Customer
Low Carbon Solar Park Limited
Status
Accepted to connect
Capacity
20 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Bolney
Bulk supply point
Bolney Grid
Point of connection
Bolney Grid 33kV
Voltage
33 kV
Date accepted
21 Sept 2021
Target energisation
18 Oct 2027
In a connection queue
Yes
Row last updated by the DNO
15 Apr 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Horsham
Postcode
RH13 8DL

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.