Brogborough Solar Farm

Brogborough Solar Farm, Infinis Energy Services Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 30.5 MW, grid supply point Sundon.

Customer
Infinis Energy Services Limited
Status
Accepted to connect
Capacity
30.5 MW
Technology
Solar, Storage (Photovoltaic)
Flexible connection
No
Grid supply point
Sundon
Bulk supply point
Westoning Grid 33kV
Voltage
33 kV
Date accepted
6 Oct 2021
In a connection queue
Yes
Row last updated by the DNO
14 Jul 2023
Licence area
EPN
Address
Woburn Road, Brogborough
Postcode
MK43 0TN

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.