Birch Road

Birch Road, Eclipse Power Networks Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 70 MW, grid supply point Rayleigh.

Customer
Eclipse Power Networks Limited
Status
Connected
Capacity
70 MW
Maximum import capacity
30 MW
Technology
Solar, Storage (Photovoltaic)
Flexible connection
No
Grid supply point
Rayleigh
Voltage
132 kV
Date accepted
14 Aug 2020
Date connected
16 Sept 2024
In a connection queue
No
Row last updated by the DNO
14 Oct 2025
Licence area
EPN
Address
Colchester
Postcode
CO2 0EJ

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.