Grid GuardianOpen the evidence in the app

Barling Landfill Site

Barling Landfill Site, Cory Environmental Ltd, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2.6 MW, grid supply point Rayleigh.

Customer
Cory Environmental Ltd
Status
Connected
Capacity
2.6 MW
Technology
Bioenergy (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Rayleigh
Bulk supply point
Fleethall Grid 33kV
Point of connection
Thorpe Bay Primary 11kV
Voltage
11 kV
Date connected
16 Jul 2004
In a connection queue
No
Row last updated by the DNO
14 Nov 2024
Licence area
EPN
Address
Southend
Postcode
SS3 0UL
Export MPAN
1030000471277

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source