Barking Energy Centre

Barking Energy Centre, WSP, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 3.8 MW, grid supply point Barking West 33kV (LPN).

Customer
WSP
Status
Accepted to connect
Capacity
3.8 MW
Technology
Gas (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Barking West 33kV (LPN)
Point of connection
Axe St 11kV
Voltage
11 kV
Date accepted
4 Jan 2022
In a connection queue
Yes
Row last updated by the DNO
14 Aug 2023
Licence area
London Power Networks plc
Address
Cowbridge Lane, Barking
Postcode
IG11 8LQ

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.