AWS Grafham Water Treatment Works
AWS Grafham Water Treatment Works, HBS Group Southern Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 7.04 MW, grid supply point Eaton Socon.
- Customer
- HBS Group Southern Limited
- Status
- Connected
- Capacity
- 7.04 MW
- Maximum import capacity
- 0 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- No
- Grid supply point
- Eaton Socon
- Bulk supply point
- Little Barford 33kV
- Point of connection
- Perry Primary 11kV
- Voltage
- 33 kV
- Date connected
- 1 Oct 2019
- In a connection queue
- No
- Row last updated by the DNO
- 13 Nov 2020
- Licence area
- EPN
- Address
- Huntingdon
- Postcode
- PE28 0BW
- Export MPAN
- 1050001872400
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.