Aveley Landfill Site - Phs 2

Aveley Landfill Site - Phs 2, Infinis Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2.1 MW, grid supply point Warley.

Customer
Infinis Limited
Status
Connected
Capacity
2.1 MW
Technology
Bioenergy (Engine (combustion / reciprocating))
Flexible connection
No
Grid supply point
Warley
Bulk supply point
Purfleet Grid 33kV
Point of connection
Purfleet Primary 11kV T3 & T4
Voltage
11 kV
Date connected
26 Jul 2006
In a connection queue
No
Row last updated by the DNO
14 Nov 2024
Licence area
EPN
Address
South Ockendon
Postcode
RM15 4HL
Export MPAN
1023545864976

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.