Attlebridge Land Fill Site
Attlebridge Land Fill Site, Novera Energy Generation, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1.2 MW, grid supply point Norwich.
- Customer
- Novera Energy Generation
- Status
- Connected
- Capacity
- 1.2 MW
- Technology
- Bioenergy (Engine (combustion / reciprocating))
- Flexible connection
- No
- Grid supply point
- Norwich
- Bulk supply point
- Thorpe Grid 33kV
- Point of connection
- Horsford Primary 11kV
- Voltage
- 11 kV
- Date connected
- 4 Mar 2016
- In a connection queue
- No
- Row last updated by the DNO
- 14 Feb 2024
- Licence area
- EPN
- Address
- Attlebridge, Norwich
- Postcode
- NR29 5TD
- Export MPAN
- 1023479942844
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.