(ANM) Walnut Road

(ANM) Walnut Road, Ben Markillie (Peters 2 Energy), is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49.9 MW, grid supply point Walpole.

Customer
Ben Markillie (Peters 2 Energy)
Status
Accepted to connect
Capacity
49.9 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
Yes (capacity not firm)
Grid supply point
Walpole
Voltage
132 kV
Date accepted
29 Oct 2021
In a connection queue
Yes
Row last updated by the DNO
14 Feb 2023
Licence area
EPN
Address
Walpole St Peter, Wisbech
Postcode
PE14 7PF

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.