(ANM) Snipe Solar Farm

(ANM) Snipe Solar Farm, Low Carbon Solar Park 25 Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 40 MW, grid supply point Rayleigh.

Customer
Low Carbon Solar Park 25 Limited
Status
Accepted to connect
Capacity
40 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Rayleigh
Voltage
132 kV
Date accepted
26 Jul 2021
Target energisation
30 Oct 2032
In a connection queue
Yes
Row last updated by the DNO
13 Oct 2023
Licence area
EPN
Address
Fambridge Road, Rochford
Postcode
SS4 3LT

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.