(ANM -N/A) Green Lane

(ANM -N/A) Green Lane, Infinis Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 17.3 MW, grid supply point Sundon.

Customer
Infinis Limited
Status
Accepted to connect
Capacity
17.3 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Sundon
Bulk supply point
Marston Road Grid 33kV
Voltage
33 kV
Date accepted
8 Dec 2022
Target energisation
31 Oct 2031
In a connection queue
Yes
Row last updated by the DNO
14 Aug 2026
Licence area
EPN
Address
Stewartby
Postcode
MK43 9LY

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.