Grid GuardianOpen the evidence in the app

(ANM - N/A) Crown Hills

(ANM - N/A) Crown Hills, Sirius Ecodev (Clapham) Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 4 MW, grid supply point Sundon.

Customer
Sirius Ecodev (Clapham) Limited
Status
Accepted to connect
Capacity
4 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Sundon
Bulk supply point
Austin Canons Grid 33kV
Point of connection
Manton Ln Primary 11kV
Voltage
11 kV
Date accepted
8 Aug 2021
In a connection queue
Yes
Row last updated by the DNO
14 Dec 2022
Licence area
EPN
Address
Clapham, Bedford
Postcode
MK41 6ET

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source