Grid GuardianOpen the evidence in the app

(ANM) Marshes Burnham-On-Crouch

(ANM) Marshes Burnham-On-Crouch, Arvense Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 17 MW, grid supply point Rayleigh.

Customer
Arvense Limited
Status
Accepted to connect
Capacity
17 MW
Technology
Solar, Storage (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Rayleigh
Bulk supply point
Fleethall Grid 33kV
Voltage
33 kV
Date accepted
23 Dec 2020
Target energisation
31 Dec 2028
In a connection queue
Yes
Row last updated by the DNO
15 Jan 2024
Licence area
EPN
Address
Burnham-On-Crouch
Postcode
CM0 8NE

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.