(ANM) Land North Of Bassmead Manor, Nextpower SPV 16 Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 50 MW, grid supply point Eaton Socon.

Customer
Nextpower SPV 16 Limited
Status
Accepted to connect
Capacity
50 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Eaton Socon
Voltage
132 kV
Date accepted
17 Feb 2021
Target energisation
31 Oct 2028
In a connection queue
Yes
Row last updated by the DNO
12 Mar 2021
Licence area
EPN
Address
Staploe, St Neots
Postcode
PE19 5JB

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.