(ANM) Land East Of Drayton Lane

(ANM) Land East Of Drayton Lane, Pathfinder Clean Energy (PACE) UK Dev Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 18 MW, grid supply point Norwich.

Customer
Pathfinder Clean Energy (PACE) UK Dev Limited
Status
Accepted to connect
Capacity
18 MW
Technology
Solar, Storage (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Norwich
Voltage
132 kV
Date accepted
9 Nov 2020
Target energisation
31 Oct 2030
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
EPN
Address
Drayton
Postcode
NR10 3AG

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.