(ANM) Land At Wood Farm Dunston

(ANM) Land At Wood Farm Dunston, FPC Electric Land Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 70 MW, grid supply point Norwich.

Customer
FPC Electric Land Limited
Status
Accepted to connect
Capacity
70 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
Yes (capacity not firm)
Grid supply point
Norwich
Voltage
132 kV
Date accepted
26 Jan 2024
Target energisation
31 Oct 2034
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
EPN
Address
Stoke Lane, Stoke Holly Cross
Postcode
NR14 8QD

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source