(ANM) Land At Rookery Farm

(ANM) Land At Rookery Farm, BF58 Hunts Airfield Solar Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 49.99 MW, grid supply point Eaton Socon.

Customer
BF58 Hunts Airfield Solar Limited
Status
Accepted to connect
Capacity
49.99 MW
Technology
Solar, Storage (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Eaton Socon
Voltage
132 kV
Date accepted
11 Feb 2021
Target energisation
31 Oct 2032
In a connection queue
Yes
Row last updated by the DNO
14 Dec 2022
Licence area
EPN
Address
The Lane, Huntingdon
Postcode
PE28 0TP

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.