(ANM) Land At Middlewick & Steeplewick
(ANM) Land At Middlewick & Steeplewick, Dengie Marshes Wind Farm Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 120 MW, grid supply point Rayleigh.
- Customer
- Dengie Marshes Wind Farm Limited
- Status
- Accepted to connect
- Capacity
- 120 MW
- Technology
- Onshore wind (Onshore wind turbines)
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Rayleigh
- Voltage
- 132 kV
- Date accepted
- 30 Nov 2023
- In a connection queue
- Yes
- Row last updated by the DNO
- 15 Jan 2024
- Licence area
- EPN
- Address
- The Marshes, Southminster
- Postcode
- CM0 7JQ
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.