(ANM) Hanningfield Wtw
(ANM) Hanningfield Wtw, Bluestone Rettendon 1 Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 7 MW, grid supply point Rayleigh.
- Customer
- Bluestone Rettendon 1 Limited
- Status
- Accepted to connect
- Capacity
- 7 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Rayleigh
- Bulk supply point
- Nevendon Grid 33kV
- Voltage
- 33 kV
- Date accepted
- 20 Jun 2022
- Target energisation
- 30 Oct 2032
- In a connection queue
- Yes
- Row last updated by the DNO
- 15 Jan 2024
- Licence area
- EPN
- Address
- South Hanningfield, Chelmsford
- Postcode
- CM3 8HS
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.