Grid GuardianOpen the evidence in the app

(ANM) Greenfield Road

(ANM) Greenfield Road, Cragside Energy Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 30 MW, grid supply point Sundon.

Customer
Cragside Energy Limited
Status
Accepted to connect
Capacity
30 MW
Technology
Storage (Storage - Electrochemical (Batteries))
Flexible connection
Yes (capacity not firm)
Grid supply point
Sundon
Bulk supply point
Westoning Grid 33kV
Voltage
33 kV
Date accepted
15 Aug 2023
Target energisation
31 Oct 2034
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
EPN
Address
Westoning, Bedford
Postcode
MK45 5JD

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source