(ANM) Glebe Farm

(ANM) Glebe Farm, DNO Consulting Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 30 MW, grid supply point Walpole.

Customer
DNO Consulting Limited
Status
Accepted to connect
Capacity
30 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Walpole
Bulk supply point
Hempton Grid 132/33kV
Voltage
33 kV
Date accepted
29 Apr 2025
In a connection queue
Yes
Row last updated by the DNO
15 May 2025
Licence area
EPN
Address
West Raynham, Fakenham
Postcode
NR21 7HB

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.