(ANM) Eaton Ford Solar Park
(ANM) Eaton Ford Solar Park, Low Carbon Soilar Park 30 Limted, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 20 MW, grid supply point Eaton Socon.
- Customer
- Low Carbon Soilar Park 30 Limted
- Status
- Accepted to connect
- Capacity
- 20 MW
- Technology
- Solar, Storage (Photovoltaic)
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Eaton Socon
- Bulk supply point
- Little Barford 33kV
- Voltage
- 33 kV
- Date accepted
- 21 Apr 2022
- Target energisation
- 31 Oct 2032
- In a connection queue
- Yes
- Row last updated by the DNO
- 15 Jan 2024
- Licence area
- EPN
- Address
- Abbotsley
- Postcode
- PE19 6XG
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.