(ANM) East Of Guanockgate Road

(ANM) East Of Guanockgate Road, PACE Titan Energy Limited C/O External Services Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 78 MW, grid supply point Walpole.

Customer
PACE Titan Energy Limited C/O External Services Limited
Status
Accepted to connect
Capacity
78 MW
Technology
Solar, Storage (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Walpole
Voltage
132 kV
Date accepted
17 Jan 2022
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
EPN
Address
Gorefield, Wisbech
Postcode
PE13 4PL

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.