Grid GuardianOpen the evidence in the app

(ANM) East And West Of Low Street

(ANM) East And West Of Low Street, AGR Group, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 16 MW, grid supply point Walpole.

Customer
AGR Group
Status
Accepted to connect
Capacity
16 MW
Technology
Onshore wind (Onshore wind turbines)
Flexible connection
Yes (capacity not firm)
Grid supply point
Walpole
Bulk supply point
Hempton Grid 33
Voltage
33 kV
Date accepted
4 Feb 2024
In a connection queue
Yes
Row last updated by the DNO
12 Jul 2024
Licence area
EPN
Address
Low Street, Breckland
Postcode
PE32 2TQ

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source