(ANM) Dogsthorpe Landfill Site

(ANM) Dogsthorpe Landfill Site, Infinis Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 7 MW, grid supply point Walpole.

Customer
Infinis Limited
Status
Accepted to connect
Capacity
7 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Walpole
Point of connection
Peterborough East Grid 11kV
Voltage
33 kV
Date accepted
24 Jan 2022
In a connection queue
Yes
Row last updated by the DNO
15 Jan 2024
Licence area
EPN
Address
Welland Road, Peterborough
Postcode
PE1 3TD

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.