(ANM) Crays Hall Farm

(ANM) Crays Hall Farm, Crays Hall Solar Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 25.9 MW, grid supply point Warley.

Customer
Crays Hall Solar Limited
Status
Accepted to connect
Capacity
25.9 MW
Maximum import capacity
0 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Warley
Bulk supply point
Shenfield Grid 33kV
Voltage
33 kV
Target energisation
30 Jun 2025
Date connected
20 Feb 2026
In a connection queue
Yes
Row last updated by the DNO
12 Dec 2025
Licence area
EPN
Address
Crays Hill, Basildon
Postcode
CM11 2UN

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.