(ANM) Crays Hall Farm
(ANM) Crays Hall Farm, Crays Hall Solar Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 25.9 MW, grid supply point Warley.
- Customer
- Crays Hall Solar Limited
- Status
- Accepted to connect
- Capacity
- 25.9 MW
- Maximum import capacity
- 0 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Warley
- Bulk supply point
- Shenfield Grid 33kV
- Voltage
- 33 kV
- Target energisation
- 30 Jun 2025
- Date connected
- 20 Feb 2026
- In a connection queue
- Yes
- Row last updated by the DNO
- 12 Dec 2025
- Licence area
- EPN
- Address
- Crays Hill, Basildon
- Postcode
- CM11 2UN
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.