(ANM) Chelmsford

(ANM) Chelmsford, Hanningfield Green Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 41.8 MW, grid supply point Rayleigh.

Customer
Hanningfield Green Limited
Status
Accepted to connect
Capacity
41.8 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Rayleigh
Bulk supply point
Chelmsford East Grid 33kV
Voltage
33 kV
Date accepted
2 Oct 2021
Target energisation
31 Dec 2028
In a connection queue
Yes
Row last updated by the DNO
13 Oct 2023
Licence area
EPN
Address
Southend Road, Chelmsford
Postcode
CM2 7TD

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.