(ANM) Aylmer Hall Farm

(ANM) Aylmer Hall Farm, EPL Newco1 Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 199.99 MW, grid supply point Walpole.

Customer
EPL Newco1 Limited
Status
Accepted to connect
Capacity
199.99 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Walpole
Voltage
132 kV
Date accepted
29 Apr 2025
In a connection queue
Yes
Row last updated by the DNO
13 Jun 2025
Licence area
EPN
Address
Church Road, Kings Lynn
Postcode
PE34 4QG

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.