(ANM) Alpington Hall Farm

(ANM) Alpington Hall Farm, Renewable Connections Developments Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 9.8 MW, grid supply point Norwich.

Customer
Renewable Connections Developments Limited
Status
Accepted to connect
Capacity
9.8 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Norwich
Voltage
11 kV
Date accepted
18 Sept 2025
In a connection queue
Yes
Row last updated by the DNO
12 Dec 2025
Licence area
EPN
Address
Church Meadow Lane, Norwich
Postcode
NR14 7NE

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.