(ANM) Algores Way

(ANM) Algores Way, MVV Environment Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 62 MW, grid supply point Walpole.

Customer
MVV Environment Limited
Status
Accepted to connect
Capacity
62 MW
Technology
Gas (Steam turbine (thermal power plant))
Flexible connection
Yes (capacity not firm)
Grid supply point
Walpole
Voltage
132 kV
Date accepted
21 May 2021
In a connection queue
Yes
Row last updated by the DNO
14 Feb 2023
Licence area
EPN
Address
Wisbech
Postcode
PE13 2TQ

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.