Grid GuardianOpen the evidence in the app

Alkane Site

Alkane Site, Kent Renewable Energy Partnership Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 8.6 MW, grid supply point Richborough/Sellindge 132kV.

Customer
Kent Renewable Energy Partnership Limited
Status
Connected
Capacity
8.6 MW
Technology
Bioenergy (Steam turbine (thermal power plant))
Flexible connection
No
Grid supply point
Richborough/Sellindge 132kV
Bulk supply point
Richborough Grid 33kV
Voltage
33 kV
Date connected
30 Apr 2018, 30 Apr 2018
In a connection queue
No
Row last updated by the DNO
12 Jul 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Ramsgate Road, Sandwich
Postcode
CT13 9ND

Register rows

RowStatusMWTarget
1Connected6.2
2Connected8.6

Rows at one site are not summed.

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.