London West Connection Node A 400kV Substation (NGET) has 1 project in NESO's TEC Register of 23 Oct 2026: 199.92 MW in the queue, 199.92 MW Gate 1, and 0 MW connected. Contracted capacity, not headroom.
Transmission owner
NGET
Projects
1
MW in the queue
199.92 MW
Gate 1 MW
199.92 MW
MW connected
0 MW
By technology
Technology
Projects
MW
Storage
1
199.92
Projects at London West Connection Node A 400kV Substation