Wyatt Farm

Wyatt Farm, PV Farms, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 1 MW, grid supply point Bramford.

Customer
PV Farms
Status
Connected
Capacity
1 MW
Maximum import capacity
0.05 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Bramford
Bulk supply point
Diss Grid 33kV
Point of connection
Kenninghall Primary 11kV
Voltage
11 kV
Date connected
23 Dec 2015
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Wyatt Farm, Norwich
Postcode
NR16 2JZ

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.