Woodlands Farm

Woodlands Farm, EEB45 Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 40 MW, grid supply point Bramford.

Customer
EEB45 Limited
Status
Accepted to connect
Capacity
40 MW
Technology
Solar (Photovoltaic)
Flexible connection
No
Grid supply point
Bramford
Voltage
132 kV
Date accepted
28 Nov 2019
Target energisation
6 Jun 2025
In a connection queue
Yes
Row last updated by the DNO
13 Oct 2023
Licence area
EPN
Address
Stowmarket
Postcode
IP14 2AH

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.