Wolves Solar Farm
Wolves Solar Farm, Arise Renewable Energy UK Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 60 MW, grid supply point Bramford.
- Customer
- Arise Renewable Energy UK Limited
- Status
- Accepted to connect
- Capacity
- 60 MW
- Technology
- Solar (Photovoltaic)
- Flexible connection
- Yes (capacity not firm)
- Grid supply point
- Bramford
- Voltage
- 132 kV
- Date accepted
- 23 Sept 2026
- In a connection queue
- Yes
- Row last updated by the DNO
- 14 Oct 2026
- Licence area
- EPN
- Address
- Wolves Hall Lane, Clacton On Sea
- Postcode
- CO16 0DG
A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.
Source
- UK Power Networks Embedded Capacity Register (1 MW and over), UK Power Networks, publication of 14 Oct 2026. CC BY 4.0, UK Power Networks.