Grid GuardianOpen the evidence in the app

Wolves Solar Farm

Wolves Solar Farm, Arise Renewable Energy UK Limited, is accepted to connect in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 60 MW, grid supply point Bramford.

Customer
Arise Renewable Energy UK Limited
Status
Accepted to connect
Capacity
60 MW
Technology
Solar (Photovoltaic)
Flexible connection
Yes (capacity not firm)
Grid supply point
Bramford
Voltage
132 kV
Date accepted
23 Sept 2026
In a connection queue
Yes
Row last updated by the DNO
14 Oct 2026
Licence area
EPN
Address
Wolves Hall Lane, Clacton On Sea
Postcode
CO16 0DG

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source