Grid GuardianOpen the evidence in the app

Whitewall Road

Whitewall Road, Peak Reserve Power LLP, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 5 MW, grid supply point Kingsnorth.

Customer
Peak Reserve Power LLP
Status
Connected
Capacity
5 MW
Technology
Gas (Gas turbine (OCGT))
Flexible connection
No
Grid supply point
Kingsnorth
Point of connection
Strood 11kV
Voltage
11 kV
Date connected
17 Nov 2023
In a connection queue
No
Row last updated by the DNO
14 Jun 2024
Licence area
South Eastern Power Networks (EPN) (as printed: the name and the code are two different licences)
Address
Medway, Rochester
Postcode
ME2 4DZ
Export MPAN
1900092421122
Import MPAN
1900092421169

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source