Grid GuardianOpen the evidence in the app

Westmill Landfill Site

Westmill Landfill Site, Biffa Waste Management Limited, is connected in UK Power Networks's Embedded Capacity Register of 14 Oct 2026 at 2.3 MW, grid supply point Rye House.

Customer
Biffa Waste Management Limited
Status
Connected
Capacity
2.3 MW
Technology
Bioenergy (Steam-gas turbine (CCGT))
Flexible connection
No
Grid supply point
Rye House
Bulk supply point
Rye House Grid 33kV
Point of connection
Ware Primary 11kV
Voltage
11 kV
Date connected
1 Jan 2015
In a connection queue
No
Row last updated by the DNO
13 Nov 2020
Licence area
EPN
Address
Ware
Postcode
SG12 0ES
Export MPAN
1030013500087

A distribution project is the rows of one DNO’s Embedded Capacity Register that agree on licence area, customer site, grid supply point and customer; no DNO publishes a reference on every row. Each row’s capacity is the DNO’s own figure for that row and rows are never summed. Accepted to connect is the DNO’s status; a flexible (ANM) connection’s capacity is not firm. A target energisation date is as published, a planned date. Distribution MW are never added to TEC.

Source